Corrosion-resistant metal works:

Surface preparation:

  • rounding of sharp edges;
  • removal of weld spatter and slag;
  • abrasive surface treatment to Sa2, Sa2,5, Sa3;
  • mechanical surface treatment (manual) St2;
  • dedusting;
  • degrease;

Coating application:

  • strip color;
  • required number of layers application in compliance with all requirements for applying coatings;
  • coverage quality control

Overhaul of the inner surface of the concrete tanks:

Surface preparation:

  • removal of old plaster;
  • applying new plaster;
  • replacement of pipes and manholes;

Coating application:

  • applying first layer penetrating epoxy resin;
  • reinforced fiberglass mounting;
  • required number of layers application in compliance with all requirements for applying coatings;
  • coverage quality control;
  • tank impenetrability control.

Industrial floor covering:

Surface preparation:

  • grinding of the concrete surface;
  • epoxy putty irregularities elimination;
  • applying epoxy different colors and roughness.

Available equipment:

  • sand bladting equipment for cleaning a variety of surfaces;
  • airless equipment and airblast for painting works;
  • grinding equipment;
  • electric and diesel compressors;
  • equipment for industrial alpinism, and equipment necessary to perform the above activities;
  • diesel generators for use in the field;
  • warehouses and cabins;
  • trucks, cars for transportation of equipment and materials.