Corrosion-resistant metal works:
Surface preparation:
- rounding of sharp edges;
- removal of weld spatter and slag;
- abrasive surface treatment to Sa2, Sa2,5, Sa3;
- mechanical surface treatment (manual) St2;
- dedusting;
- degrease;
Coating application:
- strip color;
- required number of layers application in compliance with all requirements for applying coatings;
- coverage quality control
Overhaul of the inner surface of the concrete tanks:
Surface preparation:
- removal of old plaster;
- applying new plaster;
- replacement of pipes and manholes;
Coating application:
- applying first layer penetrating epoxy resin;
- reinforced fiberglass mounting;
- required number of layers application in compliance with all requirements for applying coatings;
- coverage quality control;
- tank impenetrability control.
Industrial floor covering:
Surface preparation:
- grinding of the concrete surface;
- epoxy putty irregularities elimination;
- applying epoxy different colors and roughness.
Available equipment:
- sand bladting equipment for cleaning a variety of surfaces;
- airless equipment and airblast for painting works;
- grinding equipment;
- electric and diesel compressors;
- equipment for industrial alpinism, and equipment necessary to perform the above activities;
- diesel generators for use in the field;
- warehouses and cabins;
- trucks, cars for transportation of equipment and materials.